Floor Power Distribution Unit (PDU), Remote Power Panel (RPP), and Overhead Busway

#power-distribution-unit
Also called
  • PDU
  • RPP
  • Floor Power Distribution Unit
  • Overhead Busway
  • Tap-Off Box

Plain-English definition

White-space distribution gear downstream of the UPS that steps medium or 480 V three-phase power down (where transformers are fitted) and splits feeder power into protected branch circuits delivered via floor RPPs or overhead track busway tap-off boxes.

Why it matters on shift

Floor PDUs, RPPs, and overhead busway tap-offs form the physical bridge between gray-space UPS buses and individual IT cabinets; mislabeling A/B busways or overloading a tap-off phase drops entire rows of racks.

Illustrative operational example

In an illustrative AI hall layout, dual color-coded 800 A overhead busways (blue Busway A, red Busway B) feed ceiling tap-off boxes above each cabinet, eliminating underfloor whip congestion so cold air flows unobstructed.

Scope, code & safety boundary

Installing or removing an overhead busway tap-off box requires explicit verification of OEM hot-plug listing, load-off mechanical interlocks, NFPA 70E arc-flash boundaries, and an approved site MOP.

Explanatory diagram · Switchgear & color-coded A/B busway galleryWhen dual A and B feeds keep a rack online, and when they fail
Three-panel diagram comparing intact 2N A and B rack feeds at 41% and 43% load against an over-50% failover overload trip and a mispatched A/A single-side cord error, above a shared equipment bonding bar.

Dual-corded servers survive a single-feed outage only when Path A and Path B stay independent, each side runs below 50% normal load, power cords land on opposite PDUs, and breakers clear faults selectively over one common equipment ground.

Read plain-text walkthrough of this diagram

Panel 1 shows Busway A at 41% and Busway B at 43% feeding Rack PDU-A and Rack PDU-B, with Server PSU-1 on A and PSU-2 on B; losing Path A places 84% on Path B without tripping. Panel 2 shows Busway A at 58% and Busway B at 56%, where losing Path A pushes Path B to 114% and trips the surviving breaker. Panel 3 shows both PSU-1 and PSU-2 mistakenly plugged into PDU-A, dropping the host during planned Side A LOTO work. Callout 4 shows Rack rails and both PDU enclosures bonded to one common Equipment Grounding Bar.

Related courses & interactive lab practice

BeginnerRS-101~86 min open lessons
The Critical Floor

Facility, rack & safety foundations

BeginnerRS-102~87 min open lessons
Utility to Rack

Critical power & dual-path feeds

AdvancedRS-203~85 min open lessons
AI Density Lab

High-density AI cooling & commissioning

Free interactive simulator
Campus Shift · 6-Mission Browser Lab

Practice live readings and switching in "2N Blackout & Live Diesel Synchroscope" with no login required.

Primary standards & technical references

Practice with the equipment

Try this concept in a live scenario.

Walk through six free guided browser missions in Campus Shift, or study all nine self-paced courses from Beginner to Advanced at $399 self-paced tuition ($1,600 list, save $1,201).